Main Floor

1.    REMOVE AND REPLACE FRONT PROSCENIUM WALL

2.    CONSTRUCT EGRESS STAIR AT EAST SIDE OF STAGE.

3.    MODIFY STAGE FOR REQUIRED EGRESS DIMENSIONS.

4.    MODIFY LOWER STAGE WALL CONSTRUCTION TO COMPLY WITH FIRE SEPARATION REQUIREMENTS.

5.    INSTALL GYPSUM BOARD AT CEILING AND WALL AREAS OF STAGE TO COMPLY WITH FIRE SEPARATION REQUIREMENTS.

6.    REMOVE AND/OR REPLACE WINDOW AT SOUTH WALL OF STAGE.   

7.    INSTALL FIRE SUPPRESSION SYSTEM INCLUDING STANDPIPES AT EACH SIDE OF STAGE(FIRE SUPPRESSION TO BE INSTALLED IN ENTIRE BUILDING).

8.    INSTALL NEW DOOR AT EXISTING EXIT LOCATION AT EAST WALL OF AUDITORIUM.

9.    INSTALL GYPSUM BOARD AT FORMER WINDOW OPENINGS OF AUDITORIUM AND BALCONY TO COMPLY WITH FINISH RATING REQUIREMENTS.

10.   REPAIR CEILING AT EXISTING WORK MATERIALS ROOM TO COMPLY WITH FIRE SEPARATION REQUIREMENTS.

11.    CONSTRUCT NEW CORRIDOR THRU TECH. DIRECTOR'S OFFICE TO CONNECT EXISTING CORRIDOR WITH EXISTING STAIR WELL AT NORTHWEST CORNET BUILDING TO COMPLY WITH EGRESS REQUIREMENTS.

12.    MODIFY ENTRANCES TO AUDITORIUM TO COMPLY WITH EGRESS REQUIREMENTS.

13.    INCREASE STAIR WIDTH AND HEAD CLEARANCE HEIGHT TO COMPLY WITH EGRESS REQUIREMENTS.

14.    REMOVE EXISTING COMBUSTIBLE FINISHES AT STAIR AND INSTALL GYPSUM BOARD TO COMPLY WITH FINISH RATING REQUIREMENTS.

15.    INSTALL FIRE TREATED CURTAINS AND DROPS AT STAGE.