1. INSTALL GYPSUM BOARD AT CEILING OF BOILER ROOM AND FORMER COAL BIN TO CONFORM WITH FIRE SEPARATION REQUIREMENTS.
2. INSTALL GYPSUM BOARD AT REQUIRED AREAS OF WALLS IN BOILER ROOM AND FORMER COAL BIN TO CONFORM WITH FIRE SEPARARTION REQUIREMENTS.
3. INSTALL FIRE RATED DOORS AT BOILER ROOM TO CONFORM WITH FIRE SEPARATION REQUIREMENTS.
4. RE-CONSTRUCT OPENINGS AT EXTERIOR WALLS OF FORMER COAL BIN.
5. REMOVE EXISTING LOUVER AT BOILER ROOM, INSTALL CONSTRUCTION TO FILL RESULTING OPENING.
6. REMOVE EXISTING EXTERIOR DOOR AND STAIR AT BOILER ROOM, INSTALL LOUVER AT RESULTING OPENING.
7. REMOVE AND REPLACE EXISTING STAIR AT BOILER ROM TO CONFORM WITH EGRESS REQUIREMENTS.
8. REMOVE AND REPLACE LOWER WINDOWS AT WEST ELEVATION.
9. REPAIR CEILING AT EXISTING GALLERY TO CONFORM WIHT FIRE SEPARATION REQUIREMENTS.
10. MODIFY EXISTING WALL BETWEEN STUDIO THEATER AND CORRIDOR TO PROVIDE REQUIRED ACCESS TO CORRIDOR TO CONFORM WITH EGRESS REQUIREMENTS.
11. INSTALL DOOR(S) AT EXISTING STAIR TO CONFORM WITH EGRESS AND FIRE SEPARATION REQUIREMENTS.
12. REMOVE EXISTING DOORS AT STAIR AND FILL OPENINGS TO CONFORM WITH FIRE SEPARATION REQUIREMENTS.
13. REMOVE COMBUSTIBLE FINISHES AND INSTALL GYPSUM BOARD AT STAIR AND ADJACENT SPACES TO COMPLY WITH FIRE SPEARATION AND FINISH RATING REQUIREMENTS.